13th. Sepember 2000
|
The HMS Tireless incident, where a UK nuclear powered submarine was successfully repaired in Gibraltar, raised many issues and concerns. The Government of Gibraltar commissioned a report from a team of experts to advise on the safety and suitability of the repair. This is the executive summary of their initial report. NUCLEAR SAFETY ADVISORY PANEL TO THE GOVERNMENT OF GIBRALTAR REPORT ON THE SAFETY OF HMS TIRELESS WHILST UNDER REPAIR AT GIBRALTAR Date: 13 September 2000 EXECUTIVE SUMMARY HMS Tireless entered Gibraltar harbour on 19 May 2000, with a leaking weld in the reactor primary circuit, and is currently berthed there awaiting repairs. This report presents the findings of the Nuclear Safety Advisory Panel set up in response to this by the Chief Minister, Government of Gibraltar. The Panel was tasked to give an informed assessment on the nuclear safety of the submarine under repair, compared with a submarine on a normal recreational visit. The Panel was selected for its extensive knowledge on nuclear safety, including nuclear powered submarines. The Panel used this knowledge to request, check and test the large amount of written and verbal information provided by the MoD on the proposed repairs, and to perform its own assessment. The repair activities planned by the MoD comprise partially draining the reactor primary circuit as a necessary precursor to remaking the weld, subjecting the weld to extensive examination and then pressure testing the primary circuit. The submarine will then depart from Gibraltar under nuclear power in the normal way. The Panel has carefully considered the MoD plans, independently identified the nuclear safety issues and sought resolution of these issues. The scope included the safety of the submarine reactor before, during and after these repair activities, and the safety of the primary circuit water and other radioactive waste to be brought ashore for temporary storage. The following were identified by the Panel as the key factors:
Before reaching these conclusions, the Panel had received a significant and sufficient amount of information from the MoD, who has been co-operative. The Panel is satisfied with the quality of the MoD safety case and the underlying safety culture. Nevertheless, it should be noted that all the above findings are largely based on the Panel's independent knowledge of the issues involved. The Panel has therefore concluded that the proposed repair of HMS Tireless at Gibraltar does not raise any significant new safety or technical concerns.
Signatures:
|